K2/K3 project Demineralized Water Production system achieved availability

Updated: 2019-05-29

On May 7, the K2/K3 project Demineralized Water Production system (Code: WDP) achieved availability after a positive result of online instrumentation sampling analysis.

WDP system is the first processing system being commissioned in overseas HPR1000 projects. During its implementation, the project team encountered the hardships of overseas chemical procurement, PLC logics and equipment for first-time use. Nevertheless, the team properly handled all difficulties with thoughtful plan, including the preparation of temporary laboratory and compressed air system, and eventually made the availability of WDP possible.